BRUNTON ENGINEERING & CONSTRUCTION provides specialised engineering solutions across Structural, Rail, Mechanical and Civil & Construction projects. Below are several case studies outlining the requirements and outcomes of each - across industries.
During 2013, Brunton Engineering & Construction was engaged for the replacement of an antiquated palletising system bridge that conveys goods from the production area to the dispatch area.
Barrett Burston Malting is a major supplier of malt to Australia’s domestic and international brewing industry.
The company’s upgrade converted the facility from existing low-efficiency, high-emission NOx burners to a modern system of NOx-free high-performance Varinox heaters and Glass Tube Heat Exchanger units supplied by the Swiss company Flucorrex.
V/Line engaged Brunton Engineering & Construction to undertake detailed investigation of the heritage-listed Melton Viaduct at Melton, Victoria. Originally constructed for Victorian Railways in 1886, the structure uniquely displays late 19th-century advances in bridge design and construction.
Brunton Engineering & Construction was engaged by John Holland Rail Services for the replacement of five bridge decks over 48 hours during the March 2018 ARTC ‘super-occupation.
Brunton Engineering & Construction was selected via public tender for the design, supply and installation of platform shelters at Bacchus Marsh, Donnybrook, Lara, Marshall, Melton, Riddells Creek and Wallan in 2015.
In April 2018, Brunton Engineering & Construction staff completed replacement of the 120m Mount Emu Creek rail bridge during a nine-day occupation.
Toyota Australia has a well-known history as a major producer in Australia’s automotive market. Since the company’s inception in 1996, projects completed by Brunton Engineering & Construction for Toyota include:
In 2013, Brunton Engineering & Construction was engaged by GMW from February to May for the supply of movable cofferdam to enable repair works on Mildura Weir.
Brunton Engineering & Construction was engaged by CSR Bradford through Visy’s ‘Build Run Repair’ to relocate its Dandenong plant to Scoresby in 2015 and 2016.
Working closely with PhD students at the University of Melbourne, Brunton Engineering & Construction was selected for the construction of precast elements for impact testing research.
Brunton Engineering & Construction performed culvert replacements at numerous locations on the Victorian rail network.
Toyota Australia has a well-known history as a major producer in Australia’s automotive market. Since the company’s inception in 1996, projects completed by Brunton Engineering & Construction for Toyota include:
Working closely with PhD students at the University of Melbourne, Brunton Engineering & Construction was selected for the construction of precast elements for impact testing research.
Brunton Engineering & Construction performed culvert replacements at numerous locations on the Victorian rail network.
Brunton Engineering & Construction was engaged by John Holland Rail Services for the replacement of five bridge decks over 48 hours during the March 2018 ARTC ‘super-occupation.
Brunton Engineering & Construction was selected via public tender for the design, supply and installation of platform shelters at Bacchus Marsh, Donnybrook, Lara, Marshall, Melton, Riddells Creek and Wallan in 2015.
In April 2018, Brunton Engineering & Construction staff completed replacement of the 120m Mount Emu Creek rail bridge during a nine-day occupation.
During 2013, Brunton Engineering & Construction was engaged for the replacement of an antiquated palletising system bridge that conveys goods from the production area to the dispatch area.
Barrett Burston Malting is a major supplier of malt to Australia’s domestic and international brewing industry.
The company’s upgrade converted the facility from existing low-efficiency, high-emission NOx burners to a modern system of NOx-free high-performance Varinox heaters and Glass Tube Heat Exchanger units supplied by the Swiss company Flucorrex.
V/Line engaged Brunton Engineering & Construction to undertake detailed investigation of the heritage-listed Melton Viaduct at Melton, Victoria. Originally constructed for Victorian Railways in 1886, the structure uniquely displays late 19th-century advances in bridge design and construction.
Toyota Australia has a well-known history as a major producer in Australia’s automotive market. Since the company’s inception in 1996, projects completed by Brunton Engineering & Construction for Toyota include:
In 2013, Brunton Engineering & Construction was engaged by GMW from February to May for the supply of movable cofferdam to enable repair works on Mildura Weir.
Brunton Engineering & Construction was engaged by CSR Bradford through Visy’s ‘Build Run Repair’ to relocate its Dandenong plant to Scoresby in 2015 and 2016.