V/LINE – CULVERT REPLACEMENTS

SUMMARY

Brunton Engineering & Construction performed culvert replacements at numerous locations on the Victorian rail network.

SUMMARY

Brunton Engineering & Construction performed culvert replacements at numerous locations on the Victorian rail network.

CLIENT

V/LINE

REQUIREMENTS

SHARE THIS

To ensure an optimal outcome, this civil engineering work required a detailed understanding of existing services and potential spoil contamination, as well as ensuring earthmoving equipment works to tight structural tolerances.

Due to the considerable demand for precast, Brunton Engineering & Construction’s in-house team of concreters was tasked with constructing specific precast elements such as headwalls, retaining walls and drainage components to meet tight project timeframes.

Project highlights included:
• Supply of quarry and pre-cast components
• Provision of necessary environmental preparations for existing natural vegetation
• Removal of existing structure and replacement with a new fit-for-purpose civil structure