Brunton Engineering & Construction performed culvert replacements at numerous locations on the Victorian rail network.
To ensure an optimal outcome, this civil engineering work required a detailed understanding of existing services and potential spoil contamination, as well as ensuring earthmoving equipment works to tight structural tolerances.
Due to the considerable demand for precast, Brunton Engineering & Construction’s in-house team of concreters was tasked with constructing specific precast elements such as headwalls, retaining walls and drainage components to meet tight project timeframes.
Project highlights included:
• Supply of quarry and pre-cast components
• Provision of necessary environmental preparations for existing natural vegetation
• Removal of existing structure and replacement with a new fit-for-purpose civil structure