ASALEO CARE – PALLETISING SYSTEM BRIDGE

SUMMARY

During 2013, Brunton Engineering & Construction was engaged for the replacement of an antiquated palletising system bridge that conveys goods from the production area to the dispatch area.

SUMMARY

During 2013, Brunton Engineering & Construction was engaged for the replacement of an antiquated palletising system bridge that conveys goods from the production area to the dispatch area.

CLIENT

ASALEO CARE

REQUIREMENTS

Requirements Here

SHARE THIS

This project included:

  • surveys, 3D modelling and production of full fabrication drawings
  • Building extensions to existing production and dispatch areas during periods of plant operation
  • Design and construction of a 40m hollow-section truss bridge
  • Delivery of bridge on oversized escorted truck loads from workshop to site
  • Installation of bridge combining a mobile Franna and 200-tonne cranes with access from boom and scissor lifts during a single 14-hour period
  • Fit-out of mechanical elevators, lowerators and 56m of roller conveyors.